1. Current Capital Project
a. Ely Building: Major renovations to the facade with new entries, bathrooms and a new elevator.
b. Underground Electrical conduit – Upgrade of Fire Alarm Systems being installed.
c. Parenzo Gym Floor – Removing old bleachers; repair damaged sections of floor; refinishing and repainting of athletic grids / lines for multiple sports.
d. Wilson Hall Classroom Security Door Upgrades
2. Past Capital Projects - 2007, 2008
a. Dever Auditorium - Upgraded lighting, fire alarm system, stage rigging and curtains. Repaired catwalks. Built new sound booth. Installed new carpet and handicapped seating.
b. Parenzo - Roof completely replaced in the summer of 2008
c. Wilson – Second and Third floor Labs renovated (2008)
d. Wilson – Back Exterior Wall of building repaired (2008)
e. Wilson - Asbestos removed from steam pipes and pipes re-covered (2008)
f. Scanlon Hall – Installed new Elevator, Front Entry, Public renovations, etc.
g. Courtney Hall - New Sprinkler system installed. (2008) Lounges, Halls and Public Area renovations (2008)
h. Field House – Install New Press Box (2007)
i. Athletic Field – Installed Astroturf on field (2007)
j. Davis Hall – New Windows throughout (2007)
k. Dickinson Hall – New Windows throughout (2007)
l. Dickinson and Lammers Halls – New Student Furniture installed.
m. Juniper Park - Electrical Upgrades including Fire alarm system, electrical panels, and a new Emergency Generator
3. Future Capital Projects (Potential)
a. New Academic Building
b. Library aesthetic upgrades
c. Scanlon Hall Bathroom upgrades
d. New Facilities / Receiving / Public Safety Building
e. Access Road to Route 20
f. Ely Hall pool repairs and upgrades